
Add to Cart
CC496K copper stress relieve annealing bushing with powder Coating
Description
The bushing is a matching part used outside the mechanical parts to achieve the functions of sealing, wear protection, etc. It refers to the ring sleeve that functions as a gasket. In the field of valve applications, the bushing is inside the valve cover, and corrosion-resistant materials such as polytetrafluoroethylene or graphite are generally used for sealing.
Powder coating
It is a new type of solvent-free 100% solid powder coating. It has two categories: thermoplastic powder coatings and thermosetting powder coatings. Features:
1. The product is non-toxic, free of solvents, and free of volatile and toxic substances, so there is no pollution, no fire, no emissions of "three wastes" and other public hazards, and it fully meets the requirements of the national environmental protection law.
2. The utilization rate of raw materials is high, the oversprayed powder can be recycled, and the utilization rate is over 99%.
3. After the pre-treatment of the coated object, one-time construction, without primer coating, can obtain a coating film of sufficient thickness, easy to realize automatic operation, high production efficiency, and cost reduction.
4. Dense coating, good adhesion, impact resistance and toughness, high corner coverage, excellent chemical resistance and electrical insulation.
5. The storage and transportation of powder coatings are safe and convenient.
CNC Machining | Description |
Product name | CC496K copper stress relieve annealing bushing with power Coating |
Material | CC496K copper |
Surface Roughness | Ra0.8 |
Tolerance | ±0.05 |
Coating | Power |
Packing | Poly bag+Carton with pallet |
Drawing Format | DWG/DXF/IGS/STEP/X-T and PDF |
Certificate | ISO9001 |
Requirement | All edges slightly deburred |
Factory Display
Packing way
Package
Plating line
Heat Treatment
1Q:What information does the quotation need?
A:Pls. offer your drawings and/or samples, quantity and packing’s requirements.
Drawings in PDF, IGS, DWG, STEP, MAX are suitable to us.
2Q:What’s lead time for samples and products?
A:Lead time for samples: 30-70days depend on the structure of the part and other requirements on heat treatment, machining, surface
treatment and so on.
Mass production lead time: 35-70days depend on products’ characteristics and quantity.
3Q:What is the requirement on payment?
Tooling Cost:50% deposit,50% after samples passed.
Payment for the Order:50% deposit,50% to be paid before shipment.